Restoration Work - Phase 2
Phase 2 - Nave North & South Aisle Roofs
Phase 2 - South Aisle Roof
Work started on Phase 2 in February 2003 by R & J Hogg Ltd.
This work is confined to the nave aisle roofs. The architect is
Tony Redman of the Whitworth Co-partnership.
The work undertaken includes: Re-leading the roof; repairing
the parapets; repairing and treating rotted joists and repairing
the guttering. The lead roof has to be made as a two phase
drop and as such requires the addition of a stainless steel
joist to take the weight.
Below is a short gallery of photos taken during Phase 2
restoration. The photos were taken on the 14th March 2003 during a
visit by our MP Richard Spring. Click on a thumb-nail image to reveal the full sized
picture. Then click on the browser "back button" to return
to the gallery.
|